Five plots on a small development, each needing a slab. Booked separately, that is five mobilisation charges, five minimum load fees and five days lost from the programme.

Booked as one coordinated pour, the same work often fits into a single day with one pump, one delivery schedule and one set up crew. The saving is real, but only if the sequencing is right.

Easypump Concrete Ltd runs coordinated multi property pours across London, Hertfordshire, Bedfordshire, Buckinghamshire, Essex and Northampton, supplying both the concrete and the pump on a single booking.

What a Coordinated Multi Property Pour Means

A coordinated pour treats several separate plots, units or buildings as one continuous job rather than a series of unrelated deliveries. The pump moves through the site in a planned order, and concrete arrives timed against that order.

It is not simply booking the same day for everything. The volumes, mix types, set up positions and delivery gaps are all planned backwards from a single finish time, which is what makes it work.

Where This Approach Fits Best

Easypump sees coordinated pours most often on small residential developments where several houses reach slab stage within a week of each other. The plots share access, the mixes are usually identical and the volumes are individually small.

Typical situations that suit a single day pour:

The common thread is proximity and repetition. Where plots are scattered across different postcodes, the travel time between them usually cancels out the saving.

Why One Day Beats Five Separate Bookings

The obvious saving is mobilisation. Every separate pump booking carries its own travel, set up and minimum charge, so consolidating five visits into one removes four of those.

Multi Property Pour

The less obvious saving is programme time. Each pour day disrupts the site regardless of how small the volume is, and the follow on trades cannot start until curing allows. Pouring together means the whole run of plots enters the same curing window and reaches the next stage at the same time.

The main gains from consolidating:

Planning the Pour Sequence

Sequence is the part that decides whether the day runs smoothly or collapses by lunchtime. The rule is to work from the plot the pump can reach last back towards the exit, so you never trap the pump behind a slab that is still green.

Easypump plans this at quote stage using a site plan and access photos. On most small developments the pump takes two or three set up positions rather than moving for every plot, since a boom can often serve two adjacent slabs from one standing.

Sequence checklist before the day:

  1. Map reachable plots per set up position and count how many moves are genuinely needed
  2. Pour furthest first so completed slabs never block the route out
  3. Allow 20 to 40 minutes per pump move, including outrigger reset and pipeline check
  4. Group identical mixes together to avoid washing through between grades
  5. Confirm each plot is fully ready, since one unfinished shutter stops the whole chain
  6. Set a cut off time after which any remaining plot is deferred rather than rushed

Getting the Concrete Supply Right

Delivery scheduling is where coordinated pours usually go wrong. Order everything for 7am and mixers queue in the road going off; space them too far apart and the pump sits idle on your bill.

Easypump handles this by supplying the concrete and the pump together, so deliveries are timed against the actual pour sequence rather than a guess. For multi plot work, volumetric and onsite mixed concrete are often the better choice, since the mix is batched on site and quantities adjust as each slab fills.

Supply factors that need agreeing in advance:

Access and Set Up on Multi Plot Sites

Half built developments rarely have finished roads. The ground between plots is often unmade, soft or crossed by open service trenches, and a pump on outriggers puts heavy concentrated loads through a small area.

Easypump checks this before arrival rather than on the day. Spreader pads, compacted haul routes and a confirmed standing position for each phase of the pour all get agreed at booking, along with overhead clearance for boom work near scaffolding or temporary power.

Access points worth confirming early:

Labour Planning for a Single Day Run

A coordinated pour needs more people than a single slab, but fewer than five separate pours would. The finishing crew moves with the pump, which means each slab needs to be levelled and floated before the crew is called forward to the next one.

The usual failure is under staffing. If finishing falls behind the pump, the whole sequence backs up and later plots get poured in a rush at the end of the day, which is exactly when quality slips.

Realistic Timings

Individual plot slabs on a small development are commonly 10 to 25 cubic metres each. A boom pump places far faster than that, so the day length is driven by pump moves, mixer arrivals and finishing rather than pumping itself.

As a rough shape for a five plot day, allow 45 minutes for initial set up, 30 to 60 minutes of placing per plot depending on volume, 20 to 40 minutes per pump move, and 45 minutes at the end for wash down. That typically lands a five plot run inside a normal working day with contingency.

Build slack for these:

What It Costs

Easypump prices a coordinated pour on total volume, number of set up moves, time on site, distance from the Hatfield depot and access complexity across the plots. Consolidating plots almost always brings the cost per cubic metre down compared with booking each one separately.

Booking a Coordinated Pour With Easypump

Waiting time remains the biggest variable. When concrete and pump come from the same supplier, that risk largely disappears, since delivery intervals are planned against the pour sequence rather than negotiated between two companies on the morning.

Booking a Coordinated Pour With Easypump

Easypump Concrete Ltd is based at Hatfield and covers London, Hertfordshire, Bedfordshire, Buckinghamshire, Essex and Northampton.. Multi plot days need more planning than a single pour, so give as much notice as you can, ideally two weeks or more where permits are involved.

Call 01582 550287 or 07894 989118, or email admin@easypump.co.uk with the details below and the team will build the sequence and delivery schedule for you.

Have this ready:

Frequently Asked Questions

How many properties can be poured in one day? It depends on volume per plot and how many pump moves are needed. Five to eight small slabs on one development is common, while larger volumes or scattered plots may need two days.

Do all the plots need the same concrete mix? No, but grouping identical mixes together speeds the day up. Easypump can supply different grades, though changing mix mid sequence adds wash through time between loads.

What happens if one plot is not ready on the day? Easypump agrees a cut off point in advance. Unready plots are skipped and rescheduled rather than holding up the rest of the sequence, which protects the plots that are ready.

Is a boom pump or a line pump better for multi plot work? A boom pump usually serves more plots per set up position. Line pumps suit tight internal access or very small individual slabs, and some sites use both across the day.

Can Easypump supply the concrete as well as the pump? Yes. Easypump supplies ready mix, volumetric and onsite mixed concrete with pump hire and a trained operator, which is what makes the delivery timing work on multi plot days.

How far in advance should a coordinated pour be booked? Two weeks or more is sensible, particularly if permits or road closures are needed. Shorter notice is sometimes possible subject to availability.